Skip to content
Refinish Wraps Architectural Film Refinish Wraps Architectural Film
  1. Home
  2. Hotels and resorts

Hotels and resorts

Guest room doors, corridors, elevators, front desks and casegoods, refinished while you keep selling rooms. We schedule around your occupancy, not the other way around.

Hotel corridor with guest room doors refinished in dark walnut film
Guest room doors refinished in walnut

Count your doors

Type in a few numbers to get a rough count of the main surfaces on your property. Send that count with your quote request and we can give you a ballpark faster.

120guest room entry doors
2elevator cab interiors
12elevator landings

Closets, bathrooms, connecting doors, stairwells and back of house doors come on top of this.

Built around occupancy

We can't wrap a guest room door with someone sleeping on the other side of it, so every hotel job starts with the front office. You decide how many rooms come off the board each day. We work those rooms, put the hardware back, and hand them back the same day.

Corridor work happens when the halls are quiet. Elevators come out of service one at a time. Lobby work like the front desk and columns is done overnight or in sections so check in never stops.

Tip. Pair the door work with your slow season and you can release more rooms per day, which shortens the whole project.

Where hotels use film

  • Guest room entry doors and frames. Both sides.
  • Connecting, closet and bathroom doors.
  • Casegoods. Desks, dressers, nightstands, headboards, TV walls.
  • Bathroom vanities.
  • Elevator cabs and landings. See our elevator page.
  • Front desk, concierge and lobby columns.
  • Restaurant and bar fronts.
  • Back of house. Service corridor doors and kitchen doors.

Why the math works

Replacing a guest room door is a new slab, often new hardware prep, a painter for the frame, a dumpster for the old one and a room out of inventory while it all happens. Film skips the demolition, the disposal and most of the trades.

That's how owners typically land at up to 70% less than replacement, with rooms back in service the same day.

  • 0demolition or haul away
  • 1trade on site instead of several
  • Daysfor film to ship, not months

Hotel questions

Can you meet our brand standards?

In most cases. Brand approved finish boards often call out specific wood, stone and metal looks, and the 3M DI-NOC and Benif catalogs cover a lot of them. Send us the spec and we'll send physical samples you can submit for brand approval.

How many rooms can you do in a day?

That depends on how many rooms you can release and how much is in scope per room. Doors only goes much faster than doors plus casegoods. We'll build the daily count with your front office before we start.

Will guests notice the work?

There's no demolition and no paint smell, and most doors need no sanding at all. When damage has to be filled and sanded, we keep it to those spots and use dust and noise control, so most guests never know. We keep tools and material on carts, work behind closed doors when we're inside rooms, and do corridor work during quiet hours.

Do you work on PIP deadlines?

Yes. Film ships in days, so it's often the fastest way to close out door, casegood and elevator line items on a PIP. Tell us the deadline when you reach out.

Walk us through your property.

Send the room count, a photo of a typical guest room door from both sides, and anything else on your PIP list. We'll come back with a ballpark and a schedule idea.

(561) 802-1148

Text or call. Photos get you the fastest answer.

Call now